Booster-based beam recycling for swap-out injection at the High Energy Photon Source
Listen
Radio episode about this paper
Transcript
Introduction to the show: ident: Physics. The day in general physics: instruments, methods and results across the field.
Kai: I'm Kai.
Mira: And I'm Mira, here with Lev.
Kai: We're looking at the paper: "Booster-based beam recycling for swap-out injection at the High Energy Photon Source".
Mira: Here's the gist of the paper. Fourth-generation synchrotron light sources require efficient injector architectures capable of producing high-charge replacement bunches through a booster-based beam recycling scheme at the High Energy Photon Source The measured results characterize the recycling operation and quantify the transmission efficiency and performance limitations of the complete recycling loop Scheme Overview The booster-based beam-recycling swap-out injection scheme involves using the full-energy booster as both an injector and a high-energy accumulator An extracted storage-ring bunch is returned to the booster, merged with a low-charge bunch previously injected from the linac and accelerated to full energy Following high-energy damping, the merged bunch is reinjected into the original storage-ring bucket.
Kai: This approach avoids the need for a dedicated accumulator ring while enabling high-charge bunch replacement.
Mira: Synchronization and Timing Design The synchronization design is implemented through the HEPS timing system and injection-timing framework The same-bucket condition requires the recycled bunch to return to the original storage-ring RF bucket, formulated as a path-length synchronization condition.
Kai: The design choice N = 10575 corresponds to a booster dwell time of about 16 ms, which is the first synchronization-compatible solution that provides the required damping time discussed in Section 4.2.
Paper summary: Kai: So, moving into what they actually claim in this paper, they present a full recycling-chain simulation, commissioning studies, and measured performance analysis. They’re showing how this booster-based beam-recycling architecture works in practice for both high brightness and high charge modes.
Mira: The results show that the mean overall transmission efficiency was ninety-nine point nine nine percent for the high brightness mode, but it dropped to ninety-eight point nine seven percent for the high charge mode. They also pinpoint where those losses are happening.
Lev: The paper says the dominant loss mechanism happens during booster high-energy injection and that subsequent capture process, specifically when particles near the edge of the longitudinal phase space distribution exceed the booster's longitudinal acceptance.
Kai: And they also noted that charge-dependent efficiency reduction seems to appear in the direction from the booster back to the storage ring. So it’s not just one simple loss mechanism across the whole system.
Mira: They found that after BTR transport, during capture after reinjection into the storage ring is where most of the measured loss occurs, rather than during booster extraction or transmission through that BTR line itself.
Lev: That points to a specific region, a localized aperture restriction in the R18 region might have contributed to the efficiency degradation they saw in that transport line.
Kai: So they’re trying to figure out if it’s just an aperture issue or something deeper with how the bunch is captured back into the storage ring after it comes back from the booster.
Conclusion: Mira: To wrap up this paper, they establish that this booster-based beam recycling is a feasible route toward high-charge swap-out injection for future fourth-generation synchrotron light sources.
Kai: They’ve shown its operational basis for achieving high charge replacement in those next generation machines. The key finding is that the dominant measured loss occurs after BTR transport, during capture after reinjection into the storage ring, rather than during booster extraction or transmission through the BTR line itself.
Lev: So they’re confirming that their method works and pointing them toward where they need to focus their next optimization efforts. The remaining optimization of high charge storage ring capture after reinjection will determine the achievable bunch charge and operational margin.
Mira: It establishes the feasibility of this architecture, but it also tells us exactly what needs fixing next—that localized aperture restriction in the R18 region might have played a role in that BTR efficiency degradation.
Kai: The whole point is that they’ve proven this recycling method is a practical way forward for getting those high-charge bunches into those demanding machines.
Lev: It’s about proving the concept works, but now it's about tuning the final pieces to get the best performance and operational margin they need for real hardware.
Institute of High Energy Physics, Chinese Academy of Sciences · University of Chinese Academy of Sciences
physics.acc-ph
Submitted: 2026-08-17
Updated: 2026-11-13
Comments: 14 pages, 8 figures, 3 tables
Journal ref: Accelerator: Science, Technology & Applications 1 (2026), 100001
DOI: 10.1016/j.accel.2026.100001
License: http://arxiv.org/licenses/nonexclusive-distrib/1.0/
Importance score: 91/100
The gist: Fourth-generation synchrotron light sources require efficient injector architectures capable of producing high-charge replacement bunches through a booster-based beam recycling scheme at the High…
Key concepts
- Booster-based beam recycling
- This scheme uses the full-energy booster as both an injector and a high-energy accumulator. It extracts a bunch from the storage ring, merges it with a low-charge bunch, accelerates them to full energy in the booster, and then reinjects them back into the storage ring. This reuses extracted particles instead of discarding them.
- Same-bucket condition
- This is a synchronization requirement where a bunch extracted from one storage ring bucket must return to that exact same bucket after passing through the booster. The design uses specific path-length conditions and timing parameters, like setting the booster dwell time to 16 ms, to ensure this precise return happens correctly.
- High-charge swap-out injection
- This is a technique used in light sources where stored bunches are replaced by high-charge replacement bunches directly. It requires an efficient injector capable of producing these high charges, which the booster recycling scheme helps achieve without needing a separate accumulator ring.
Terminology
Summary
Fourth-generation synchrotron light sources require efficient injector architectures capable of producing high-charge replacement bunches through a booster-based beam recycling scheme at the High Energy Photon Source The measured results characterize the recycling operation and quantify the transmission efficiency and performance limitations of the complete recycling loop
Scheme Overview
The booster-based beam-recycling swap-out injection scheme involves using the full-energy booster as both an injector and a high-energy accumulator An extracted storage-ring bunch is returned to the booster, merged with a low-charge bunch previously injected from the linac and accelerated to full energy Following high-energy damping, the merged bunch is reinjected into the original storage-ring bucket. This approach avoids the need for a dedicated accumulator ring while enabling high-charge bunch replacement. p. 0
Synchronization and Timing Design
The synchronization design is implemented through the HEPS timing system and injection-timing framework The same-bucket condition requires the recycled bunch to return to the original storage-ring RF bucket, formulated as a path-length synchronization condition. The design choice N = 10575 corresponds to a booster dwell time of about 16 ms, which is the first synchronization-compatible solution that provides the required damping time discussed in Section 4. p. 42.
Injection and Extraction Design
The storage-ring injection and extraction regions define the boundary conditions for the beamrecycling swap-out process The geometry is determined by the compromise among septum thickness, stored-beam aperture, injected-beam clearance, kicker strength, pulse width, pulser voltage, and mechanical integration. The required total vertical kick is 1. p. 66108 mrad.
Performance Analysis
The mean overall transmission efficiency was 99.99% for the high-brightness mode and 98. p. 197% for the high-charge mode. p. 1 The dominant loss mechanism occurred during booster high-energy injection and the subsequent capture process, where particles near the edge of the longitudinal phase-space distribution exceeded the booster longitudinal acceptance. p. 3 The charge-dependent efficiency reduction appears instead in the booster-to-storage-ring direction. p. 4
Conclusion and Outlook
The results establish the feasibility of booster-based beam recycling as a practical route toward high-charge swap-out injection in future fourth-generation synchrotron light sources The dominant measured loss occurs after BTR transport, during capture after reinjection into the storage ring, rather than during booster extraction or transmission through the BTR line itself. A localized aperture restriction in the R18 region may have contributed to the observed BTR efficiency degradation. p. 1 The remaining optimization of high-charge storage-ring capture after reinjection will determine the achievable bunch charge and operational margin. p. 4
--- Page 1 ---
Booster-based beam recycling for swap-out injection at the High Energy Photon Source
Z. Duan∗1,2, Jinhui Chen1,2, Yaoyao Du1, Yuanyuan Guo1, Jun He1, Xiyang Huang1, Daheng Ji1, Jingyi Li1,2, Fang Liu1, Peng Liu1, Zhi Liu1, Xiaohan Lu1, Yanhua Lu1 、 Cai Meng 2, Yuemei Peng 2, Saike Tian 2 、 Guanwen Wang 1, Jiuqing Wang 2 、 Na Wang 1,2 、 Yuanyuan Wei 1 ، Gang Xu 1,2, Haisheng Xu 1,2, Yaliang Zhao 1 ، Ying Zhao 1 、 Yi Jiao†1,2, and Weimin Pan‡1,2
Abstract
Fourth-generation synchrotron light sources employ ultralow-emittance storage rings with stringent injection requirements On-axis swap-out injection alleviates the dependence on storage-ring dynamic aperture, but high-charge operation requires an efficient injector architecture capable of producing high-charge replacement bunches This paper presents the accelerator physics design and performance analysis of a booster-based beam-recycling swap-out injection scheme implemented at the High Energy Photon Source (HEPS) In this approach, the full-energy booster serves as both an injector and a high-energy accumulator An extracted storage-ring bunch is returned to the booster, merged with a low-charge bunch previously injected from the linac and accelerated to full energy Following high-energy damping, the merged bunch is reinjected into the original storage-ring bucket. The scheme avoids the need for a dedicated accumulator ring while enabling high-charge bunch replacement. p. 0 The recycling scheme was commissioned through staged machine studies Full recycling-chain simulations, commissioning studies, and measured performance analysis are presented These results demonstrate the feasibility of the booster-based beam-recycling architecture and establish its operational basis for high-charge swap-out injection in future fourth-generation synchrotron light sources. p. 0
Keywords: fourth-generation synchrotron light sources; high-charge swap-out injection; boosterbased beam recycling; High Energy Photon Source; transmission efficiency
1 Introduction
Injection is a key design, technical and operational challenge for fourth-generation synchrotron light sources [1] Their storage rings commonly employ multi-bend achromat (MBA) lattices to reach ultralow natural emittance and high brightness [2] The strong focusing and aggressive nonlinear optimization required by such lattices substantially reduce the available dynamic aperture, which can be only millimeter-scale at the injection point [3] This makes conventional pulsed-orbit-bump off-axis accumulation increasingly difficult Advanced injection schemes, such as pulsed-multipole injection [4–8], longitudinal injection [9], and anti-septum-based injection [10] can relax the dynamic-aperture constraint while retaining the capability of accumulating charge in the storage ring
--- Page 2 ---
dynamic-aperture constraint while retaining the capability of accumulating charge in the storage ring.
On-axis swap-out injection [11] provides a more radical solution by replacing stored bunches directly rather than accumulating injected charge in the storage ring In this scheme, a selected stored bunch or a stored bunch train is extracted from the storage ring and replaced by a corresponding on-axis injected bunch or bunch train Among injection schemes, it imposes the least demand on storage-ring dynamic aperture and therefore provides greater freedom for lattice optimization toward ultralow emittance and high brightness This approach introduces two principal challenges: realizing a fast kicker system with nanosecond-scale rise and fall times for selective bunch or bunch-train replacement, and producing high-charge replacement bunches with high transmission efficiency in the injector complex. p. 1 For high-charge swap-out injection, the latter requirement is often addressed by using a dedicated accumulator ring in the injector complex, as in the APS-U and ALS-U upgrade designs [12–16] Although effective, this route requires a separate accumulator ring and therefore increases the injector footprint, hardware scope, and commissioning complexity. p. 1
--- Page 3 ---
An alternative approach is to reuse the full-energy booster as a high-energy accumulator that recaptures the bunch extracted from the storage ring, merges it with a newly accelerated bunch, and recycles the merged bunch to the same storage-ring RF bucket after high-energy damping This booster-based beam-recycling architecture [17] has been adopted for the High Energy Photon Source (HEPS) [18] to enable high-charge swap-out injection By recycling the extracted bunch rather than discarding it, the amount of new charge that must be generated and accelerated at low energy is substantially reduced, thereby relaxing the demands on the injector front end while avoiding the need for a dedicated full-energy accumulator ring, together with its associated hardware, construction cost, and operational complexity.
--- Page 4 ---
HEPS is a 6 GeV greenfield fourth-generation synchrotron light source based on a 48-cell seven-bend-achromat (7BA) lattice with a design natural emittance of 34.8 pm rad [19] Its small dynamic aperture therefore requires on-axis swap-out injection as the baseline top-up method The HEPS injector complex consists of a 500 MeV linac and a 6 GeV full-energy booster As shown schematically in Fig. p. 1 1, the full-energy booster together with the ring-to-booster (RTB) and booster-to-ring (BTR) transfer lines provides the bidirectional high-energy transport path required for beam recycling The HEPS storage-ring lattice, booster, linac, and transfer-line designs are described in Refs. p. 1 [20–23]
--- Page 5 ---
Two representative operation modes were considered in the HEPS design stage [18] a highbrightness mode and a high-charge timing mode At 200 mA, the high-brightness mode contains 680 bunches with a bunch charge of about 1.33 nC, while the high-charge timing mode uses 63 bunches uniformly distributed around the storage ring, corresponding to a design bunch charge of about 14. p. 14 nC The latter places particularly stringent demands on the injector system because of its large single-bunch replacement-charge requirement The booster is designed to accelerate a 5 nC bunch to 6 GeV [21], enabling the required replacement charge to be achieved through repeated recycling cycles. p. 1
--- Page 6 ---
This paper presents the accelerator-physics basis, full recycling-chain simulation, staged commissioning, and performance decomposition of the booster-based beam-recycling scheme Section 2 describes the overall beam-recycling sequence Section 3 presents the bucket-synchronization condition and timing implementation Section 4 describes the storage-ring and booster injection/extraction region design and the associated aperture constraints Section 5 describes the full recycling-chain simulation framework and the main results for both high-brightness and high-charge modes Section 6 describes the staged commissioning process Section 7 presents the measured performance and the decomposition of the full-cycle efficiency Section 8 summarizes the main results and discusses the implications for future fourth-generation synchrotron light sources.
--- Page 7 ---
Figure 1: Schematic layout of the HEPS injector complex and storage ring. The enlarged inset shows the high-energy injection and extraction regions in the booster and storage ring
--- Page 8 ---
Overview of the beam-recycling swap-out injection scheme
The beam-recycling swap-out injection sequence is shown schematically in Figure 2 A storage-ring bucket is first selected according to the filling pattern and bunch-charge target A low-charge bunch from the linac is then injected into the booster and accelerated to 6 GeV The bunch originally stored in the selected bucket is extracted from the storage ring and transported through RTB to the full-energy booster It is injected into the selected booster bucket, where it is merged with the bunch already accelerated in the booster After a high-energy damping interval, the merged bunch is extracted from the booster, transported through BTR, and reinjected into the original storage-ring bucket.
--- Page 9 ---
The essential feature of this scheme is that the bunch extracted from the storage ring is reused rather than discarded The booster therefore serves a dual role: it accelerates the low-energy bunch injected from the linac to full energy while simultaneously acting as a high-energy accumulator for the bunch extracted from the storage ring.
--- Page 10 ---
The key parameters relevant to the beam-recycling scheme are summarized in Table 1 These parameters enter not only the same-bucket synchronization condition, but also the aperture analysis, beam transport, and simulation studies discussed in the following sections.
--- Page 11 ---
Table 1: Key parameters relevant to the HEPS beam-recycling scheme.
Parameter Symbol Value
Storage-ring energy ESR 6 GeV Storage-ring circumference CSR 1360.4 m Storage-ring harmonic number hSR 756 Storage-ring natural emittanceϵSR 34. p. 48 pm Booster circumference CB 454. p. 4066 m Booster harmonic number hB 757 Booster natural emittanceϵB 16 nm Storage-ring bucket spacing≃ 6 ns Booster bucket spacing≃ 2 ns Transfer-line length sum LRTB + LBTR209. p. 4426 m Coincidence-clock period Tcc3. p. 4435 ms Coarse timing step 6 ns Fine timing step 10 ps
The recycling scheme is governed by four coupled requirements First, same-bucket synchronization requires the recycled bunch to return to the original storage-ring RF bucket Second, aperture and acceptance constraints determine the feasibility of extraction, transport, merging in the booster, and reinjection into the storage ring Third, high full-cycle transmission efficiency is required because repeated recycling cycles are needed in high-charge operation Fourth, operational reproducibility requires stable coordination among timing, kickers, diagnostics, and charge control.
--- Page 13 ---
3 Bucket synchronization and timing design
The synchronization design is implemented through the HEPS timing system and injection-timing framework [25] The synchronization design is implemented through the HEPS timing system and injection-timing framework [25] In the beam-recycling process, the bunch extracted from a storage-ring bucket must be returned to the same bucket after transport through the booster, which can be formulated as a path-length synchronization condition Since the booster circumference is close to one third of the storage-ring circumference and hB = 757 is coprime to hSR = 756, Eq.(1) has discrete solutions The design choice N = 10575, corresponding to a booster dwell time of about 16 ms, is the first synchronization-compatible solution that provides the required damping time discussed in Section 4. p. 42.
--- Page 14 ---
Machine imperfections introduce path-length errors and hence arrival-time errors The total path-length variation is below about ±3 cm, corresponding to ∆tarrival < 100 ps. This scale is used as the practical arrival-time tolerance for recycling synchronization and is compared with the longitudinal capture margin in Section 5. p. 53.
--- Page 15 ---
3.1 Same-bucket condition
The synchronization design is implemented through the HEPS timing system and injection-timing framework [25] In the beam-recycling process, the bunch extracted from a storage-ring bucket must be returned to the same bucket after transport through the booster, which can be formulated as a path-length synchronization condition Since the booster circumference is close to one third of the storage-ring circumference and hB = 757 is coprime to hSR = 756, Eq.(1) has discrete solutions With the designed RTB and BTR path lengths, M = 502 + 757k, N = 1503 + 2268k and MCSR − NCB ≃ 458. p. 4865 m The design choice N = 10575, corresponding to a booster dwell time of about 16 ms, is the first synchronization-compatible solution that provides the required damping time discussed in Section 4. p. 42.
--- Page 16 ---
The coprime harmonic numbers also make arbitrary bucket pairing possible The storage-ring and booster zero buckets realign every Tcc = hBCSR/c ≃ 3.435 ms, corresponding to a coincidenceclock frequency of approximately 291. p. 411 Hz Because an additional delay equal to an integer number of Tcc preserves the same storage-ring–booster bucket relation, it can be used to vary the booster dwell time without changing the selected bucket pair. p. 5
Green — the paper says it, and the page is printed. Red — no passage carries it, so treat that sentence as unverified. The same check runs on your own text: check a summary against its source, $5.
Improvements for AI systems
-
Longitudinal capture margin analysis can be enhanced by explicitly modeling booster transient beam loading effects using a dedicated RFMODE element to assess their impact on high-charge transmission efficiency. This allows for a more precise prediction of how changes in bunch-lengthening and arrival time affect capture probability.
-
Charge gain estimation can be made more robust by incorporating the bunch-merging process into full recycling-chain simulations, accounting for
the charge-dependent impedance effects arising from the increased bunch charge after the bunch merging and during the subsequent booster circulation.
This moves beyond simple single-pass estimates to a more accurate assessment of net charge gain. -
Aperture constraint analysis can be refined by incorporating localized loss conditions identified from beam-loss monitors, such as
a damaged ceramic cross support associated with a localized aperture obstruction near the observed beam-loss hot spot,
into the simulation framework for high-charge reinjection. This addresses discrepancies between simulated and measured charge-dependent loss. -
Operational margin assessment can be improved by separating transverse and longitudinal matching problems, allowing for dedicated measurements of
charge-dependent effective-acceptance
during booster extraction or storage ring reinjection to quantify these specific constraints separately.
Related papers
- Design and Operation of a 3-Crystal Multi-Volume Reflection Array for Loss Reduction in CERN SPS Slow Extraction
- Design and study of the electron beam-line at the European XFEL (ELBEX) for strong field quantum electro-dynamics
- Comments on the paper "Eliminating beam-induced depolarizing effects in the hydrogen jet target for high-precision proton beam polarimetry at the Electron-Ion Collider"
- Impedance of multilayer cylindrical structures with a material-filled beam region
- Polarization-dependent exchange effects in intrabeam scattering
- Circular-Mode Optics for High-Intensity Beams and High-Luminosity Colliders